A data flag was out of place, and Stream 1 had to be backed up. All are still moving forward to the end of the December of their respective spin up phases.

Stream 1 date completed: 19781202

Stream 2 date completed: 19881124

Stream 3 date completed: 19971124

The at the end of December of each stream, the system will be rebuilt one last time.
While checking the output data, several minor bugs were found in the output, but nothing that changes the physics. A few other bugs have also been found, which may be non-zero in the physics. These are present being address, but none are considered to be significant changes to the results or validation of the system.

Generally, when the system is running 10 days of reanalysis are produced every day, from each stream. This may not add up with extrapolations from recent posts, because of computer downtime, or backing up the system.