Stream 1 has completed Jan 1979 through Dec 1988, catching up to the beginning of Stream 2. The reamining Stream 1 data will be released to the the download site within a week or so. Further, we are conituing Stream 1 for two additional years in order to study the initialization of Stream 2, and evaluate the transition of the data between the two streams.
Stream 2 should catch up to the begining of Stream 3 by the end of July. We we conduct a similar evatuation of the transtion between streams there as well.
Stream 3 production is on hold, pending a fix to allow for a format change in some of hte input data. It will resume ASAP.